Commercial Ductless Heating & Cooling Systems

Commercial Ductless Heating & Cooling Systems logo
A ductless heat pump is a highly efficient heating and cooling system that does not require the use of ducts. They are typically easy to install and can dramatically reduce the energy wasted by less efficient electric heating systems like baseboard, wall heaters and electric furnaces. GHPUD is now offering an incentive for Ductless Heat Pumps in commercial applications up to 20,000 square feet.
  • Must replace an existing electric resistance heating system
  • Building must be constructed before 2009
  • Building must be under 20,000 SQFT
  • Easy, low-cost installation
  • Comes standard with air conditioning

Incentive Information

Incentive of $300-$1,000 per ton* for eligible customers.
ARI rated cooling capacity will be used to determine tonnage, rounded up or down to the nearest whole ton.

*Grays Harbor PUD reserves the right to revise program rules and guidelines, including discontinuing all or part of the available incentives at any time and without prior notice. All projects once approved, will be subject to the guidelines and incentives in place at the time of approval.
Eligibility
Qualifying applications have the following characteristics:
• The area conditioned by the DHP is heated by either zonal or forced air
electric resistance heat as the primary system (gas is not eligible), and 20,000 SF or less.
• The space conditioned by the DHP is not currently conditioned by an air source,
ground source or ductless heat pump.

Post-conditions:
Installed Ductless Heat Pumps must have all of the following features:
• A split system heat pump employing an inverter-driven outdoor
compressor, inverter-driven or variable-speed indoor blower.
• Rated with a minimum of 10.0 HSPF for ducted or mixed systems and 11.0 HSPF for non-ducted. BPA will accept only products listed on the BPA Ductless Heat Pump
Qualified Products List.

Contractors must be on the District's approved contractor list or members of the Air Northwest Trade Ally Network.

*PRE-APPROVAL REQUIRED
Steps to Participate
1. Contact Energy services at Grays Harbor PUD for more information and to determine eligibility.
2. Contact a contractor or vendor on the District's approved contractor list or Air Northwest Trade Ally Network to request quotes.
3. Submit application, DHP Project Information Form, contractor bids and technical information.
4. Pre-approval by Grays Harbor PUD for projects must be obtained prior to material purchase and installation.
5. Upon project completion the contractor or customer will notify Grays Harbor PUD, and provide all paid invoices and other documentation associated with the project.
6. Grays Harbor PUD will conduct a final inspection of the project to verify the project and compliance with the proposal. The rebate will be processed once the inspection is completed.